Project Umbrella Translation
REPAIR WORK MEMO
Plans to repair HVAC equipment and switchboards
・Main entrance
・2F to 3F staircase landing
・B2F waterway to sewer
(Off-limits to general staff)
Plans to repair HVAC equipment and switchboards
・Main entrance
・2F to 3F staircase landing
・B2F waterway to sewer
(Off-limits to general staff)
Official Japanese Transcript
補修工事メモ
空調設備と、配電盤の補修予定
・正面玄関
・2F→3F階段踊り場
・B2F水路→下水道
(一般職員立ち入り禁止)
空調設備と、配電盤の補修予定
・正面玄関
・2F→3F階段踊り場
・B2F水路→下水道
(一般職員立ち入り禁止)
Official English Transcript
"Due to errors or changes in localization, the following may contain inconsistencies with the official Japanese text."
REPAIR WORK MEMO
Repair plan: A/C unit, Switch panel
・Main Entrance
・3F->4F Landing space
・Room 403
・B2F Channel -> Drainage
(AUTHORIZED PERSONNEL ONLY)
REPAIR WORK MEMO
Repair plan: A/C unit, Switch panel
・Main Entrance
・3F->4F Landing space
・Room 403
・B2F Channel -> Drainage
(AUTHORIZED PERSONNEL ONLY)